The building inspection and a timber pest inspection carried out together, in one visit and one booking.
The building component follows AS 4349.1 and the timber pest component AS 4349.3. A timber pest inspection reports evidence and conducive conditions found on the day; it is neither a treatment nor a guarantee that a property is free of pests.
0 checkpoints across 0 areas on a standard Pakenham East building and pest inspection. On a site still under construction we need the lot open and the builder told we are coming. Where a stage is not yet complete we say so in the report rather than pass it.
Building findings and conducive conditions recorded nearby, each caption naming the suburb.





New Construction Stage Inspections Seven checks through a Pakenham East build, each timed before the work is closed in.
Pre-Handover (PCI) Inspections The last inspection while the final payment is still yours to hold.
Defect Investigation Reports One failure, examined against what the engineering actually required.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of the established homes around Pakenham. Instant online pricing, or talk to the booking team on 1300 471 805.
No, and that separation is deliberate. Treatment and any warranty attaching to it come from a licensed pest controller. We report what is there so you can engage one knowing what the job is.
No. It means no evidence was visible in the accessible areas on the day of the inspection. Termites work inside timber and behind linings, so certainty is not available to any inspector, and anyone offering it is overselling.
Clear them. Pull garden beds back off the slab, move stored timber away from the house, fix the drainage that is keeping ground wet at the foundation and cut back planting close in. Most of it is cheap and it removes the invitation.